Search & filter

Search for a publication

Search & filter

Author

List of products by author: J. V. Vicent Velasco

Showing 1 - 1 of 1 document
  • Read more
    0,00 €

    Abstract: To begin EPBM tunneling of Mexico City’s Metro Line 12 a working shaft was designed at the end of the previous cut and cover section. To reduce surface disruption duringconstruction the shaft is just 34 m long and 14 m wide, with the added problem of construction within a very soft soil. This paper describes the design and verifications carried out for the workingshaft.

    0,00 €
Showing 1 - 1 of 1 document