Search & filter
Search & filter
Abstract: Line 6 of Santiago Subway (Chile) is 15.2 km long and has 10 stations. The Project for Detailed Engineering of Shafts & Galleries for the Line 6 was awarded to the Consortium ZañartuGeocontrol in March 2012. The construction of Section I, where Lo Valledor Station is located, was awarded to the Consortium METRO 6 Ltda, constituted by SALINI IMPREGILO and the works began in March 2013. The...