Search & filter
Search & filter
Abstract: Deep excavations are common for tunnel constructions in urban areas nearby existing structures. In this paper, design of deep excavation of cut and cover tunnel for Portal of dual tube Konak Tunnel in the Konak Square in İzmir, is presented. The maximum height of excavation is 20 m. At the right side of excavation section with maximum height, adjacent 5 storey masonry museum building is...