Search & filter
Search & filter
Abstract: Grouting of the rock mass around tunnels is performed to reduce water inflow. Pressure and flow-rate of the grout is recorded on the rig during grouting, but there is little documentation of the pressure of groundwater and grout in situ in the drill hole and neighbouring holes before, during and after the grouting. Instrumentation was developed to record pressure at the back of the packers...