Search & filter
Search & filter
Abstract: Dubai’s Deep Tunnel Storm Water System (DTSWS) project is intended to collect subsurface and storm water from about 500km2 of newly urbanising communities of Dubai, and to transfer the captured flow to the sea. The tunnel is a segmental lining tunnel excavated by TBM. The tunnel presents an internal diameter of 10m and 350mm of segment thickness and the use of steel fibres reinforced concrete...