Search & filter

Search for a publication

Search & filter

Author

List of products by author: D. Martin

Showing 1 - 1 of 1 document
  • Read more
    0,00 €

    Abstract: The Site C Clean Energy Project is currently under construction in northeast British Columbia, Canada. The 1100 MW hydroelectric project includes two diversion tunnels 700 m and 792 m long, excavated to nominal 12 m diameter. Final, concrete-lined diameter is 10.8 m. Host rock is a horizontally bedded weak clay shale classes as ISRM R1 to R2. Despite the weak rock mass classification, the...

    0,00 €
Showing 1 - 1 of 1 document