Search & filter
Search & filter
Abstract: TBM thrust is, in many precast segmental lining designs, the critical loading condition when deciding between only FRC (Fibres Reinforced Concrete) or hybrid solutions (fibres + steel conventional bars). Traditionally, the TBM (Tunnel Boring Machine) pushing value used as reference by designers, when structurally checking this temporary stage, has been the maximum (or exceptional) thrust...