Search & filter
Search & filter
Abstract: The Port Said twin tube road tunnels are crossing the Suez Canal, Egypt, with length of bored stretch of 2,85 km. The tunnels were constructed in adverse soft soil conditions including groundwater with high salt concentration and the presence of dissolved methane gas. The twin tubes are connected with 2 cross passages of 17.4m length at 1km intervals. The two cross passages were constructed...