Search & filter
Search & filter
Abstract: To minimize hindrance on the navigation during the construction of the Maas-Delta-Tunnel (Blankenburg connection, Rotterdam, the Netherlands), the length of the immersed tunnel was shortened to merely two elements and by this very deep cut-and-cover sections needed to be constructed. A stringent execution sequence, whereby uplift safety in every stage was guaranteed, led to feasible lengths of...