Search & filter

Search for a publication

Search & filter

Author

List of products by author: J. Mcgovern

Showing 1 - 1 of 1 document
  • Read more
    0,00 €

    Abstract: At more than 4,300 metres in length, the Bergen Point WWTP outfall replacement tunnel was bid with the pressurized face (slurry) tunnel boring machine launched from a shaft and a starter tunnel. The bid documents prescriptively required the use of ground freezing for temporary ground support for the launch shaft and the starter tunnel with a tried and tested approach to machine launching. Post...

    0,00 €
Showing 1 - 1 of 1 document