    Abstract: At more than 4,300 metres in length, the Bergen Point WWTP outfall replacement tunnel was bid with the pressurized face (slurry) tunnel boring machine launched from a shaft and a starter tunnel. The bid documents prescriptively required the use of ground freezing for temporary ground support for the launch shaft and the starter tunnel with a tried and tested approach to machine launching. Post...