Search & filter
Search & filter
Abstract: Drainage of rock tunnel surfaces has shown to have a significant impact on project cost, time and on tunnel quality. Requirements might be set high and work can be extensive. According to research notes a threefold structure of pre-grout, rock drains and shotcrete is required to get dry conditions in the tunnel spaces. Thus, the objective is to drain the dripping or leaking water or even...