Search & filter
Search & filter
Abstract: The most important parameter used for predicting the TBM performance is the penetration depth(mm/rev) used in terms of advance rate. The factors which significantly affect the penetration depth are rock mass parameters, design of the cutterhead, and TBM operational parameters. In field tunnelling, it is difficult to accurately match the rock mass conditions and TBM operational data because of...