Search & filter
Search & filter
Abstract: The use of large diameter (greater than 10m) segmentally lined TBM tunnels is becoming increasingly commonplace. This places pressure on the segmental lining designer, who must design for more segments designed for much higher forces, and sometimes more onerous load conditions. While some of the load conditions on large diameter tunnel linings have been described in past literature, many of the...