Search & filter
Search & filter
Abstract: Tokyo Metro currently maintains 196km of structures with 9 routes, of which approximately 85% are tunnels. As a daily repair against deformation such as freaks and leakage of tunnels, cross-section repair is commonly used. However, methods and materials of crosssection repair have been used for many years without being updated. So, to introduce a method using the latest technology and...