Abstract: This publication is prepared with the intention of sharing some useful practical information gained during tunneling in Thailand. There are three double shield TBMs now excavating on three tunnels with a length of 25.26 km. Due to difficulty of geological conditions, as a result, the TBMs encountered several complications such as cutterhead clogging, abnormal disc cutter wear, crown collapses...
Abstract: During TBM-excavation of water transfer tunnel in Thailand, the “Fault 26 Incident” appeared at km. 11+675 on Dec. 20th, 2018. The unexpected large cavern was encountered by the cutter head of the TBM. The cavern was inspected and surveyed. A ground area of about 1,800m² (50x40m), was partially filled with huge blocky rock boulders reaching up to about 10m above tunnel invert. The length of the...