Search & filter
Search & filter
Abstract: It has been determined that the tunnel construction method for the Tokiwa construction area on the Hanshin Expressway Yamatogawa route shall be changed from an open-cut method to a non-open-cut method for the purpose of reducing inconvenience faced by the residents. As a non-cut method, we adopted a rectangular-shield method for the first time in the Hanshin Expressway due to restrictions of...