Search & filter
Search & filter
Abstract: The construction of a tunnel in hard or soft ground requires adaptation to the material provided by the prevailing geological conditions, whose history of origin, properties, three-dimensional structure and groundwater conditions all have to be taken into account. Geologists at the site work within a team of experts. Their job is to observe and to evaluate the encountered geological,...