Search & filter
Search & filter
Abstract: This paper describes the process taken to arrive at the ‘do nothing’ solution for the structural assessment of two heritage listed brick lined tunnels that were to be subjected to construction induced loadings during the excavations of large cuttings for an adjacent expressway.The Hunter Expressway Alliance (HEA) designed and constructed a 12.9 km length stretch of the Hunter Expressway in New...