Search & filter
Search & filter
Abstract: Excavation of large underground cavern is always a time taking process and expensive, when ramps are used for mucking during different levels of benching. To complete the excavation of surge pool cavern timely and cost-effective, a glory hole technique was applied for mucking purpose during different levels of benching. Surge pool 375 m long, 25 m wide and 67.6 m high constructed in the...