Search & filter
Search & filter
Abstract: Current tunnel design methods include empirical and analytical solutions that correlate ground movements, to soil conditions and tunnel characteristics (size and depth). These methods do not relate movements to different tunneling processes or operational parameters and therefore are not helpful in assisting engineers to specify appropriate construction methods. Several analytical and numerical...