Search & filter
Search & filter
Abstract: This paper presents the challenges of designing two assembly chambers in the Follo Line Project, EPC TBM. The chambers are required for the assembly works of the four tunnel boring machines, two machines in each chamber. These caverns are situated in hard gneiss with a depth from ground surface around 100 m in the North and 65 m in the South. The features of the assembly chambers indicate a...