Search & filter
Search & filter
Abstract: The micro-disturbed construction in mix ground is a major challenge in the shield tunnelling construction. The Nanning metro line 1 crossing a mass of buildings is confronted with the challenge of round gravel and mudstone. The settlement control scheme consisting of the selection of TBM, tunnelling parameters optimization was put forward before crossing the buildings. Then the mix proportion...