Search & filter
Search & filter
Abstract: The 1500 MW (6X250 MW), Nathpa Jhakri Hydro Power Station a run-off the river scheme presently largest in the country, is the first project commissioned by SJVN Limited . The main features of the project are a 62.5m high concrete dam , four desilting chambers each 525m long, 16.3m wide and 27.5m high, the head race tunnel (HRT) is 27.4km long and of 10.15 m diameter, surge shaft at the end of...