Search & filter
Search & filter
Abstract: This paper describes determination of tunnel cross section that considers the aerodynamic problems and the railway requirements at very long tunnel such as subsea tunnel (single track double bored tunnels, train sealing 18, train velocity 350 km/hr, tunnel length 50km). As a result, the required cross-section areas with or without the pressure reduction damper are 39 m and 47 m from an air...