Abstract: This paper describes determination of tunnel cross section that considers the aerodynamic problems and the railway requirements at very long tunnel such as subsea tunnel (single track double bored tunnels, train sealing 18, train velocity 350 km/hr, tunnel length 50km). As a result, the required cross-section areas with or without the pressure reduction damper are 39 m and 47 m from an air...
Abstract: This paper describes the concepts of design at high water pressure and impermeable ground condition in shield tunnel lining though the comparison with various design methods (elastic equation, closed form solutions, beam-spring model. Consequently, the appropriateness of various design methods depend on the main load acting on segmental lining. So, there are important of the appropriate...