Search & filter
Search & filter
Abstract: The excavation of large caverns in urban areas densely populated, in soil and under the groundwater table is always a challenging and highly risky task. This is the case of the excavation with conventional methods of the large caverns of the extension of line 5 of São Paulo Metro. In this paper, the results of the excavation in terms of monitoring data will be compared with the theoretical and...