Search & filter
Search & filter
Abstract: Rio de Janeiro Metro Line 1 is being connected to Line 4 and the excavations include several tunnels of different sizes, all of them excavated using drill and blast methodology. The vibrations due to blasting are continuously monitored, to control and, if necessary, adjust the blasting activities to levels compatible with the urban environment of Copacabana. The paper presents blasting data and...