Abstract: The DTSS Project (Phase 1) consisted of 48 km of main tunnel, 38 shafts and connecting underground structures. The main tunnel diameters vary between 3.3 metres and 6 metres and the depth of the tunnels are between 20 to 45 metres below ground. The project was divided into 6 contracts. The longest tunnel is 7.7 km. The main tunnel was constructed using Earth Balancing Pressures Tunnel Boring...