Search & filter
Search & filter
Abstract: In this paper, seismic performance evaluations were conducted to the 91 rapid-transit railway tunnels which were designed before the seismic design criteria of tunnel was established. In consideration of the fact that all the tunnels are in operation, 'The method of seismic performance evaluations for the existing tunnel' was applied, and staged evaluations were done which consist of a...