Search & filter
Search & filter
Abstract: During the excavation of the tunnel Morro Alto in the federal highway BR-101/RS was encountered faults along the longitudinal axis of the tunnel. After stabilization of deformations, the final convergence was less than 10 mm in the section close to the fault zone. Even with the apparent stability of the massive, cracks appeared in sprayed concrete line. From further research, it was identified...