Search & filter

Search for a publication

Search & filter

Author

List of products by author: T. Maeda

Showing 1 - 1 of 1 document
  • Read more
    0,00 €

    Abstract: The Hachinoshiri tunnel is a two-lane road tunnel the total length of which is 2469m. The inner section of the tunnel is designed to be 71m, for which the tunnel needs to be excavated with a cross section of 115m. Highly weathered squeezing mudstone, the unconfined compression strength, q, of which measures not greater than 0.25N/mm, is present over approximately 570m in the major direction of...

    0,00 €
Showing 1 - 1 of 1 document