Search & filter
Search & filter
Abstract: A 12 km long tunnel of East-West lot of Tehran metro line 7 is being constructed by a 9.164 m diameter Earth Pressure Balance Tunnel Boring Machine (EPB-TBM) through an old heavily built-up and congested area of the southern part of the city. General information about the project was presented in Table 1. This tunnel passes beneath buildings, different underground structures such as water...