Search & filter
Search & filter
Abstract: The lining of some large tunnels in the Hong Kong section of the Guangzhou-Shenzhen-Hong Kong Express Rail Link, has required special formwork, properly designed and calculated for the scope. Particularly for the contract C824, the Italian company CIFA Spa has studied two special formwork systems able to realize all the different sections of the 400m long bifurcation cavern, which are variable...