Search & filter
Search & filter
Mumbai Metro - Line 3 the execution strategy for delivering the Aqua line
Mumbai Metro Line – 3, the Aqua Line, also known as Colaba–Bandra-SEEPZ line, is a part of the metro system presently under construction in Mumbai, India. When completed, the 33.5-km fully underground corridor will be the first underground metro line in Mumbai and will cater to 1.7 million passengers daily with a frequency of 3-4 minutes, ferrying 2500 passengers at a time. Line-3 is expected to reduce road congestion and have a significant sustainable environmental impact on CO² emissions and fuel consumption.Recipient :
* Required fields
or Cancel
Mumbai_Metro_-_Line_3_the_Execut
A. S. K. Gupta / B. G.v.r. Raju / C. G.e. Torp Petersen
This product is no longer in stock
Availability date: