Management for material recovery in the context of SMP4 reconnaissance work
The “exploratory works” activity of the Lyon-Turin cross-border section will end with the completion of the SMP4 works, allowing the start of the actual excavation of the Mont-Cenis Base Tunnel structures. In parallel to the excavation construction sites of the Base Tunnel, the operational construction site for the reuse of excavated materials will be a challenge, both from the point of view of the supply of recovered materials to the sites and from the point of view of TELT's Sustainable Development Goals. During the SMP4 exploratory work, the implementation of recovery of the excavated materials served to generate feedback that will be used for the operational digging sites to come. This paper explains these methods of recovery and the ways in which the recovery of excavated materials can be improved.Recipient :
* Required fields
or Cancel
Management_for_Material_Recovery
J. Sénémaud / F. Spadafora / C. Salot / P. Schriqui / M.-E. Parisi
This product is no longer in stock
Availability date: