Abstract: The “exploratory works” activity of the Lyon-Turin cross-border section will end with the completion of the SMP4 works, allowing the start of the actual excavation of the Mont-Cenis Base Tunnel structures. In parallel to the excavation construction sites of the Base Tunnel, the operational construction site for the reuse of excavated materials will be a challenge, both from the point of view of...